Draft DLC Surveillance Testing Policy Update Released for Comment

DLC Logo Thumbnail

August 9, 2021

The DLC is pleased to release the following draft update to the Surveillance Testing Policy as Version SSL 5.1.  This draft will replace the current Surveillance Testing Policy and is being referred to as ‘SSL V5.1’ to indicate its alignment with the V5.1 SSL Technical Requirements.  This proposed update only addresses recent changes to the SSL Technical Requirements, with a proposed effective date of October 1, 2021. Please submit all comments using the V5.1 Surveillance Comment Form to comments@designlights.org by Friday, August 27, 2021.

The DLC is proposing to modify portions of the Surveillance Testing Policy in order to align surveillance testing and evaluation with the recently released SSL Technical Requirements V5.1. 

In the future, the DLC intends to merge the Surveillance Testing Policy language with the Technical Requirements policies rather than maintaining a separate document.  Future revisions of the Technical Requirements documents will include subsections that address surveillance testing.  For that reason, only certain sections of this policy are being modified at this time. 

New or modified language is called out in the draft with yellow boxes for ease of review. 

Key changes in the draft are noted below:

1. Section C. Invoice and Procurement

  • The DLC is proposing to extend the invoice payment period in response to stakeholder feedback.  The draft also clarifies the expectations and options for procurement, including how to address procurement of long lead time items. 

2. Section D. Product Testing and Evaluation

  • The DLC has removed the requirement for testing linear replacement lamps in a reference housing.  Consistent with V5.1, only the bare lamp test will be used to evaluate lamps selected for surveillance testing. 
  • Tolerances and metrics in Table 1 and Table 2 have been updated to reflect the V5.1 Technical Requirements. 

Comment Form

The DLC is seeking stakeholder input through the Surveillance Testing Policy SSL V5.1 Comment Form before releasing the final Policy in September 2021. Please submit all comments using the linked Comment Form to comments@designlights.org by Friday, August 27, 2021.

Source

Related Articles


Latest Articles

  • Brazill Brothers & Associates to Represent Halco in the Northeast

    Brazill Brothers & Associates to Represent Halco in the Northeast

    Norcross, Ga.-based Halco Lighting Technologies has appointed Brazill Brothers & Associates as its new representative for Halco Lighting Technologies throughout the Northeast region, effective immediately. This strategic partnership expands the manufacturer’s presence in the Northeast while strengthening Brazill Brothers’ portfolio of innovative, energy-efficient lighting and controls solutions. Brazill Brothers & Associates will represent Halco Lighting Read More…

  • MaxLite Appoints Jason Samuelian to Two Key Positions

    MaxLite Appoints Jason Samuelian to Two Key Positions

    New Jersey-based MaxLite has appointed Jason Samuelian as Vice President of Sales – C&I West Region, plus Managing Director of EV Solutions. He brings nearly 15 years of experience across the lighting, electrical, and ESCO industries, most recently serving as Senior VP/ Sales & Marketing at ESPEN Technology, where he led national initiatives across lighting Read More…